您好,歡迎來到濟南通宇恒成自動化工程有限公司網站!

服務熱線

當前位置: 首頁- 新聞中心 > 客戶見證
常見問題
新聞中心

MNS低壓配電柜安裝規范是什么?

發布時間:2021-05-17 來源:http://www.143318.com/ 瀏覽量:

1.安裝前對準備工作的檢查
1. Check the preparation before installation
在安裝前,MNS低壓抽屜柜監理工程師及甲方工程師要檢查進場道路是否暢通,必要時要求要求總包單位修建簡易運輸通道與各安裝點連接,施工場地布置應滿足文明施工的要求。同時還應檢查安裝單位的施工機具安排狀況,督促安裝單位對施工機具進行檢查,確保狀態良好。壓設備到達現場前,配電室、地溝、基礎槽鋼應已完全竣工
Before installation, the supervision engineer of MNS low-voltage drawer cabinet and the engineer of Party A shall check whether the access road is smooth. If necessary, the general contractor is required to build a simple transportation channel to connect with each installation point, and the construction site layout shall meet the requirements of safe and civilized construction. At the same time, the arrangement of construction machines and tools of the installation unit should be checked, and the installation unit should be urged to check the construction machines and tools to ensure that they are in good condition. Before the pressure equipment arrives at the site, the distribution room, trench and foundation channel steel shall be completely completed
1)、配電室
1) . distribution room
配電室:配電室施工前,低壓配電柜要將建配電室所需的詳細圖紙交予施工方(合同簽訂后2周內,重 點要落實客戶對圖紙的位置、內容、完成時間確認),并且在配電室建設過程中,我方或協作單位的技術人員要在現場監督,避免施工錯誤。(配電室建設大約需2周左右)
Distribution room: before the construction of the distribution room, the low-voltage distribution cabinet shall submit the detailed drawings required for the construction of the distribution room to the construction party (within 2 weeks after the signing of the contract, the key point is to confirm the location, content and completion time of the drawings by the customers), and during the construction of the distribution room, the technical personnel of our party or the cooperating unit shall supervise on site to avoid construction errors( It will take about 2 weeks to build the distribution room)
                           MNS低壓抽屜柜
2)、地基:MNS低壓抽屜柜槽鋼安放位置要與配電室預留的設備風道相對應,設備離墻的小距離要明確(距離太近,設備的柜門打不開)。(槽鋼焊接大約需2天,我方技術人員必須到場指導)
2) Foundation: the channel steel of MNS low-voltage drawer cabinet should be placed in the position corresponding to the equipment air duct reserved in the power distribution room, and the small distance between the equipment and the wall should be clear (the distance is too close to open the cabinet door of the equipment)( It takes about 2 days to weld the channel steel, and our technicians must be present for guidance.)
設備到達現場:
Equipment arrival at site:
3)、若配電室、地基若未建好,低壓配電柜設備要有存放位置(要防雨或提供必要的防雨材料)。
3) If the power distribution room and foundation are not built, the low-voltage power distribution cabinet equipment should have a storage location (rain proof or provide necessary rain proof materials).
2.安裝
2. Installation
2.1各配電房門窗須嚴密,低壓配電柜房內清潔。
2.1 the doors and windows of each distribution room shall be tight, and the low-voltage distribution cabinet room shall be clean.
感謝您的閱讀,希望以上內容對您有所幫助,如您想了解更多精彩內容請點擊我們的官網:MNS低壓抽屜柜http://www.143318.com
Thank you for reading, hope the above content is helpful to you, if you want to know more wonderful content, please click our official website: MNS low voltage drawer cabinet http://www.143318.com .
首頁首頁 產品產品 電話電話 置頂置頂
欧美伊久线香蕉线新在线| 波多野结衣在线女教师| 国产成人3p视频免费观看| 6一13小幻女| 国产精品极品美女免费观看| 中文japanese在线播放| 无码视频免费一区二三区| 亚洲国产日韩欧美在线as乱码| 秋霞午夜在线观看| 国产乱人伦精品一区二区| 麻豆波多野结衣| 国产精品欧美一区二区| 78期马会传真| 国产无遮挡又黄又爽高清视| 被cao的合不拢腿的皇后| 国产男女猛烈无遮挡免费视频| 99久久免费国产香蕉麻豆| 大学生一级毛片免费看**| 两个人一上一下剧烈运动| 天天想你电视剧| 一本色道久久88加勒比—综合| 性感美女视频免费网站午夜| 久久久无码人妻精品无码| 日本国产成人精品视频| 亚洲av专区无码观看精品天堂| 日本强伦姧人妻一区二区| 久久久久久久蜜桃| 揄拍成人国产精品视频| 中文天堂在线www| 尹人久久久香蕉精品| 中文字幕精品无码亚洲字| 我就想添50多的老女人水很多| 久久天天躁狠狠躁夜夜网站| 日韩午夜免费论理电影网| 久久国产精品系列| 无码AV免费毛片一区二区| 中文字幕一区二区精品区| 在逃生游戏里挨c海棠小说| chinese真实露脸hotmilf| 在线观看日韩电影| 78成人精品电影在线播放 |